March 2021: Plote Construction Inc. is inviting your company to bid on several construction projects: IDOT #150 - Arlington Heights Road from Palatine Road to IL 72 (Higgins Road) by March 4, 2021 05:00 PM . Project Description: LOCATION OF PROJECT This project begins immediately south of IL 72 (Higgins Rd) and proceeds generally northward to terminate at the southern edge of pavement at Palatine Rd. The project is located within the City of Arlington Heights within Cook County and has a gross length of 30,179 feet (5.72 miles) and a net length of 26,956 feet (5.11 miles). DESCRIPTION OF PROJECT This is a SMART overlay project with ADA sidewalk ramp improvements. The work to be performed under this contract consists of pavement patching, hot-mix asphalt surface removal, resurfacing with hot-mix asphalt surface course, placement of pavement markings, installation of raised reflective pavement markers, reconstruction of various sidewalk ramps, detector loop replacement, installation of pedestrian push button posts, and all incidental and collateral work necessary to complete the improvement as shown on the plans and as described herein.
IDOT #173 - Busse Road from IL 72 (Higgins Road) to IL 58 (Golf Road) by March 4, 2021 05:00 PM . Project Description: LOCATION OF PROJECT The SMART overlay project of Busse Road begins approximately 141 feet south of IL-72 (Higgins Road) and extends in a northeasterly direction approximately 9,471 feet (1.79 miles) to approximately 70 feet south of IL-58 (Golf Road). The improvement is in the villages of Elk Grove and Mount Prospect in Cook County. DESCRIPTION OF PROJECT This project consists of pavement patching, hot-mix asphalt surface removal, SMART overlay with polymerized hot-mix asphalt surface course, detector loop replacement, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers, sidewalk removal and replacement, and any collateral or incidental work necessary to complete the project as shown on the plans and described herein.
IDOT #4 - IL 53 / Hicks Road from US 14 (Northwest Highway) to Lake Cook Road by March 4, 2021 05:00 PM . Project Description: LOCATION OF PROJECT This project begins at a point on the centerline of Hicks Road (FAU 2592) approximately 150 feet north of the centerline of US Route 14 and extends in a northerly direction to approximately 240’ feet north of Lake Cook Road. The project is located in Cook County and has a gross and net length of 13,350 feet (2.53 miles). DESCRIPTION OF PROJECT The work to be completed under this contract consists of, pavement patching, hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings, ADA curb ramp improvements and any incidental and collateral work shown on the plans and as directed by the Engineer, or as described herein.
IDOT #176 - Montrose Avenue between Central Avenue and Pulaski Roadby March 4, 2021 05:00 PM . Project Description: LOCATION OF PROJECT This project begins at a point on Montrose Ave approximately 45 feet East of the centerline of Central Ave. and proceeds in an easterly direction for a total distance of 10,653 feet (2.02 miles) to approximately 25 feet West of the centerline of Pulaski Rd. within the City of Chicago in Cook County. The gross length of the project is 10,653 feet (2.02 miles), and the net length of the project is 9505 feet (1.80 miles). DESCRIPTION OF PROJECT This is a SMART overlay project and the work to be performed under this contract consists of ADA pedestrian ramps improvements, pavement patching, hot-mix asphalt surface removal, combination concrete curb and gutter removal and replacement, structure adjustments and drainage structure cleaning, resurfacing with hot-mix asphalt leveling binder and surface course, placement of thermoplastic pavement markings, raised reflective pavement marker installation and all incidental and collateral work necessary to complete the improvement as shown on the plans and as described herein.
IDOT #5 -IL 83; N. of I-290 to Lake-Cook Rd by March 4, 2021 05:00 PM . Project Description: LOCATION OF PROJECT This project begins at IL 83 and north of I-290 and proceeds in a northerly direction for 2.348 miles to the south of IL 19. There is an omission from Station 140+80.13 to Station 143+46.67(SB) (approximately 266.54 feet) & Station 140+67.74 to Station 143+35.77 (NB) (approximately 268.03 feet). The gross length of the project is 12,395.39 feet (2.348 miles) and the net length is12,116.46 feet (2.295 miles). This project is located within the Cities of Elmhurst & Wood Dale and the Villages of Addison & Bensenville in DuPage County. DESCRIPTION OF PROJECT This is a smart overlay and pedestrian ramp (ADA) project and the work to be performed under this contract consists of hot-mix asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal and replacement, resurfacing with hot-mix asphalt surface course, detector loop replacement, placement of thermoplastic pavement markings and all incidental and collateral work necessary to complete the improvement as shown on the plans and as described herein.
IDOT #2 - Palatine Rd: IL 62 to Roselle Rd by March 4, 2021 05:00 PM . Project Description: LOCATION OF PROJECT This project begins at a point on the centerline of FAU 1285 (Palatine Road) approximately 355feet east of Algonquin Road (IL 62) and proceeds in an easterly direction to a point approximately 515 feet east of Roselle Road within the Villages of Barrington Hills, Hoffman Estates, Inverness, Palatine, and South Barrington in Cook County. The gross and net length of the project is 25,340 feet (4.80 miles). DESCRIPTION OF PROJECT This is an overlay project and the work to be performed under this contract consists of pavement patching, combination concrete curb and gutter removal and replacement, structure adjustments and drainage structure cleaning, sidewalk removal, PCC sidewalk placement, hot-mix asphalt surface removal, resurfacing with hot-mix asphalt surface course, installation of milled rumble strips, detector loop replacement, removal and replacement of guardrail, placement of thermoplastic pavement markings, raised reflective pavement marker installation and all incidental and collateral work necessary to complete the improvement as shown on the plans and as described herein.
February 2021: Title: I-294; Ogden Ave to Cermak Rd Location: - , - Owner: Illinois State Toll Highway Authority Bid Due Date: February 22, 2021 05:00 PM Trade Codes: 008 - DBE Organizational Groups
Project Description: The work to be done under this contract shall be started on or about June 7, 2021. All work under this contract shall be completed by April 4, 2023. The location of the services to be performed for this contract is the Tri-State Tollway (I-294) between Mile Post 27.80 and Mile Post 29.50 in Cook County, Illinois. The work under this contract includes box culvert construction, earthwork, shoulder rehabilitation and reconstruction, slopewall modification, lighting, drainage, erosion and sediment control measures, maintenance of traffic and other miscellaneous work.
Title: Taxiway A&B, Service Road Relocation Location: - Chicago, IL - Owner: City of Chicago Bid Due Date: February 22, 2021 05:00 PM Trade Codes: 008 - DBE Organizational Groups
Project Description: The Work consists of furnishing all means, methods, labor, materials, tools, equipment, transportation and services for performing the General Work, Civil Work, Structural Work, Architectural Work, Landscaping Work and Electrical Work as shown on the Drawings and as described in the Technical Specifications, including all appurtenant work and accessories, to the complete satisfaction of, approval and acceptance by the City. This includes, but not limited to, Scope of work includes but is not limited to site utilities, pavement demolition, excavation, embankment, storm sewers, drainage structures, aggregate base courses, bituminous paving, roadway signage, quality control testing, and roadway markings. This description of work is intended to be general in nature and is neither a complete description nor a limitation on the Work to be performed. Contractor must perform all Work described in the Contract Documents or reasonably inferable as necessary to produce the results specified therein, except to the extent specifically indicated in the Contract Documents to be the responsibility of others.